Classification of the Evaluation Criteria: Difference between revisions
From Ameise-en
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 40: | Line 40: | ||
====Evaluations at the End of a Simulation Run==== | ====Evaluations at the End of a Simulation Run==== | ||
At the end of this section, the various evaluations | At the end of this section, the various evaluations that can be started during or at the end of the simulation runs are presented. | ||
* Possible Evaluations [[Viewlet Demos|>> Animation (Viewlet)]] | * Possible Evaluations [[Viewlet Demos|>> Animation (Viewlet)]] | ||
Revision as of 15:04, 16 May 2013
Based on the various evaluation criteria it is possible to start evaluations during and at the end of simulation runs. These evaluations are useful to analyze characteristics of a project run. Of course, some evaluation criteria(such as the "Expense over all phases" ) only make sense at the end of a simulation run.
The following table summarizes all implemented evaluation criteria(for readability reasons, the evaluation criteria have been classified in areas covering similar types).
Objectives | |
Completness of Documents | |
Remaining Errors in Documents | |
Efficiency of Reviews or Tests | |
Effectiveness of Reviews | |
Losses by Reviews or Tests | |
Expenses | |
Authors of Documents |
Evaluations at the End of a Simulation Run
At the end of this section, the various evaluations that can be started during or at the end of the simulation runs are presented.
- Possible Evaluations >> Animation (Viewlet)