Using the Simulator: Difference between revisions

From Ameise-en
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
{{NavigatorBar|Surface of the AMEISE-client|The Simulation with the component "simulation plus"}}
===Starting a new SimulationRun===
===Starting a new SimulationRun===


Line 15: Line 16:




The simulator returns, that the developer has started ths acitvity. After some steps in time with entering Proceeds the system answers that
The simulator returns, that the developer has started this acitvity. After some steps in time with entering Proceeds the system answers that
the developer has finished the specification.  
the developer has finished the specification.  
Line 37: Line 38:
The simulation can be executed by the trainee with the '''SimulationPlus-Component'''.
The simulation can be executed by the trainee with the '''SimulationPlus-Component'''.


{{NavigatorBar|Surface of the AMEISE-client|The Simulation with the component "simulation plus"}}
[[de:Die Bedienung des Simulators]]
[[de:Die Bedienung des Simulators]]
[[en:Control of the Simulator]]
[[en:Control of the Simulator]]

Revision as of 17:41, 17 April 2013

Starting a new SimulationRun

If you start a new Simulation Run , a «Proceed» is executed automatically.


Thus the model leads through intitializations that are absoutely necessary.Commands,which are entered before this Proceed are not exectued by the simulator. A saved simulation run can be continued without executing a Proceed!


Input of commands

Projects can be performed from trainees by entering commands via the surface of the simulation component. The trainee recieves feedback in form of messages from the system. For example a trainee can instruct the developer to create the specification by entering the command Specify.


The simulator returns, that the developer has started this acitvity. After some steps in time with entering Proceeds the system answers that the developer has finished the specification.

Step in time during the Project

There are two possibilities to go further in the project:

  1. Step in time of one day
  2. Step in time of several days

Step in time of one day

To step in time of one day you can click on the «Proceed» button. If you click on this button the project will proceed to the next day what means that the status of the next day will be calculated.


Step in time of several days

If the trainee wants to increase the project time by several days, it is possible to enter the desired number of steps in the field«Number of steps».Afterwards please click on the button «Proceed», to increase the project time by the chosen number of days. Every feedback, that occures during this time will be displayed in the simulation window. You can see older confirmations by using the scroll bar.


Execution of the simulation

The simulation can be executed by the trainee with the SimulationPlus-Component.